<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Entrance on DBJ.METHOD</title><link>https://method.dbj.org/entrance/index.html</link><description>Recent content in Entrance on DBJ.METHOD</description><generator>Hugo</generator><language>en-us</language><copyright>dbj.org · IP Advisory</copyright><atom:link href="https://method.dbj.org/entrance/index.xml" rel="self" type="application/rss+xml"/><item><title>Bridge to AI</title><link>https://method.dbj.org/entrance/section-05-cmm-deeper.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-05-cmm-deeper.html</guid><description>&lt;p&gt;&lt;a href="section-04-bpt-deeper.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-06-adm.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;!-- # Bridge to AI Readiness --&gt;
&lt;p&gt;CMM maturity is the prerequisite for an organisation&amp;rsquo;s AI readiness. Without defined, managed processes, AI amplifies noise — not signal. The DBJ Method builds the bridge deliberately.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;The Bridge Thesis&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;&lt;img loading="lazy" src="../method/method_assests/empty-medieval-bridge.jpg"&gt;&lt;/p&gt;
&lt;p&gt;AI tools applied to chaotic (CMM L1) processes produce chaotic results faster. The DBJ Method ensures your organisation achieves the architectural clarity needed to deploy AI with precision and governance. CMM Level 3 is the minimum threshold for responsible AI integration. CMM Level 5 — the optimising state — is where AI becomes a continuous improvement engine.&lt;/p&gt;</description></item><item><title>Capability Maturity Model</title><link>https://method.dbj.org/entrance/section-02-cmm.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-02-cmm.html</guid><description>&lt;p&gt;&lt;a href="section-01-method.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-03-bpt.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;h1 id="entry-ticket-required-before-entering-the-second-part-of-the-model"&gt;Entry ticket required before entering the second part of the model&lt;/h1&gt;
&lt;p&gt;&lt;a href="https://method.dbj.org/method/cmm/"&gt;DBJ CMM&lt;/a&gt; is TOGAF CMM tailored for businesses. All roles, but architects. They already know the &lt;a href="https://method.dbj.org/kb/togaf/togaf-architecture-capability-framework-components-and-benefits.html#architecture-maturity-models"&gt;complex CMM , designed for teams of architects&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;DBJ CMM defines five levels of organisational maturity. The DBJ Method uses this scale to measure and grow your Enterprise Architecture practice.&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Level&lt;/th&gt;
&lt;th&gt;Name&lt;/th&gt;
&lt;th&gt;Description&lt;/th&gt;
&lt;th&gt;Milestone&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;1&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Initial&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Processes are ad hoc and chaotic. Success depends on individual effort. No repeatable practices exist for EA planning or execution.&lt;/td&gt;
&lt;td&gt;Starting point&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;2&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Repeatable&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Basic project management processes are in place. Similar projects can be executed with similar results, but practices are not formalised across domains.&lt;/td&gt;
&lt;td&gt;Pre-training&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;3&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Defined&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Processes are documented, standardised, and integrated into a defined EA framework. The whole organisation operates from a shared architecture playbook. Domains are clearly identified and aligned.&lt;/td&gt;
&lt;td&gt;Target&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;4&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Managed&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Processes are measured and controlled using quantitative data. EA decisions are evidence-based. Quality and performance are predictable.&lt;/td&gt;
&lt;td&gt;Phase 2&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;5&lt;/td&gt;
&lt;td&gt;&lt;strong&gt;Optimising&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Continuous process improvement is embedded. Innovation and automation — including AI — are systematically applied to refine and evolve architecture capabilities.&lt;/td&gt;
&lt;td&gt;Destination&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;p&gt;Basically this is where we train premiership league teams. Into qualified navigators of the AI enabled business.&lt;/p&gt;</description></item><item><title>DBJ ADM</title><link>https://method.dbj.org/entrance/section-06-adm.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-06-adm.html</guid><description>&lt;p&gt;&lt;a href="section-05-cmm-deeper.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-07-taxonomy.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;h1 id="the-wheel-dbj-adm"&gt;The Wheel: DBJ ADM&lt;/h1&gt;
&lt;p&gt;&lt;a href="https://method.dbj.org/method/adm/"&gt;DBJ ADM&lt;/a&gt; is the TOGAF ADM cut down to what an organization without a
dedicated architecture team can actually sustain.&lt;/p&gt;
&lt;p&gt;Nine TOGAF steps become &lt;strong&gt;five&lt;/strong&gt;. Each one produces a written artifact. The
Business Architecture Board reviews artifacts, not conversations.&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;DBJ Step&lt;/th&gt;
&lt;th&gt;Produces&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;1 — Principles&lt;/td&gt;
&lt;td&gt;What the organization will not trade away&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;2 — Vision&lt;/td&gt;
&lt;td&gt;What is being attempted, and why&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;3 — Architecture&lt;/td&gt;
&lt;td&gt;The structure, from concept down to physical&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;4 — Decision&lt;/td&gt;
&lt;td&gt;The choice, recorded&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;5 — Governance&lt;/td&gt;
&lt;td&gt;The check that it was followed&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;div class="callout callout-note"&gt;
&lt;span class="callout-label"&gt;NOTE&lt;/span&gt;
&lt;div class="callout-body"&gt;The wheel authorizes delivery. It never delivers.&lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;It turns only at &lt;a href="https://method.dbj.org/method/cmm/#maturity-levels"&gt;CMM Level 3&lt;/a&gt; or above. Below that,
there is nothing to steer.&lt;/p&gt;</description></item><item><title>DBJ Taxonomy</title><link>https://method.dbj.org/entrance/section-07-taxonomy.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-07-taxonomy.html</guid><description>&lt;p&gt;&lt;a href="section-06-adm.html"&gt;← Back&lt;/a&gt; | &lt;a href="vocabulary.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;The common and efficient language. The whole operations names the parts of the
organization&amp;rsquo;s information space, and everyone uses the same names.&lt;/p&gt;
&lt;p&gt;Simple, solid and mature. Four &lt;strong&gt;Categories&lt;/strong&gt;, each holding four &lt;strong&gt;Capabilities&lt;/strong&gt;.&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Category&lt;/th&gt;
&lt;th&gt;Capabilities&lt;/th&gt;
&lt;th&gt;&lt;/th&gt;
&lt;th&gt;&lt;/th&gt;
&lt;th&gt;&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;&lt;strong&gt;Conceptual&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Business&lt;/td&gt;
&lt;td&gt;Information&lt;/td&gt;
&lt;td&gt;Application&lt;/td&gt;
&lt;td&gt;Technology&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;strong&gt;Logical&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Data Management&lt;/td&gt;
&lt;td&gt;Integration&lt;/td&gt;
&lt;td&gt;Platform&lt;/td&gt;
&lt;td&gt;Security&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;strong&gt;Physical&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Compute&lt;/td&gt;
&lt;td&gt;Infrastructure&lt;/td&gt;
&lt;td&gt;Network&lt;/td&gt;
&lt;td&gt;Storage&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;strong&gt;Implementation&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;Deployment&lt;/td&gt;
&lt;td&gt;Development&lt;/td&gt;
&lt;td&gt;Monitoring&lt;/td&gt;
&lt;td&gt;Operations&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;p&gt;Taxonomy does three jobs: it locates a concern, it gives roles a shared vocabulary,
and it makes knowledge findable twice.&lt;/p&gt;</description></item><item><title>Onboarding</title><link>https://method.dbj.org/entrance/entrance_home.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/entrance_home.html</guid><description>&lt;p&gt;&lt;a href="../index.html"&gt;← Back&lt;/a&gt;&lt;/p&gt;
&lt;!-- # DBJ Method Onboarding --&gt;
&lt;p&gt;&lt;strong&gt;A feasible entry&lt;/strong&gt;&lt;/p&gt;
&lt;!-- | STARTING TARGET | ULTIMATE TARGET | METHOD FLOW |
|---|---|---|
| CMM Level 3 | CMM Level 5 | B · P · T | --&gt;
&lt;hr&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Section&lt;/th&gt;
&lt;th&gt;Title&lt;/th&gt;
&lt;th&gt;Description&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;01&lt;/td&gt;
&lt;td&gt;&lt;a href="section-01-method.html"&gt;The DBJ Method&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;What the Method is, the two stages it runs in, and how they hand off to each other&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;02&lt;/td&gt;
&lt;td&gt;&lt;a href="section-02-cmm.html"&gt;Capability Maturity Model&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Five levels of organisational maturity, and why Level 3 is the gate before anything else in the Method applies&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;03&lt;/td&gt;
&lt;td&gt;&lt;a href="section-03-bpt.html"&gt;The Three Domains&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Business, Product and Technology — what each domain owns, and what it is accountable for delivering&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;04&lt;/td&gt;
&lt;td&gt;&lt;a href="section-04-bpt-deeper.html"&gt;One Loop and the two Cycles&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;How work moves from Business to Product to Technology and back, as one continuous operating loop&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;05&lt;/td&gt;
&lt;td&gt;&lt;a href="section-05-cmm-deeper.html"&gt;Bridge to AI&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Why maturity has to come before AI adoption, and what changes at each level as it is introduced&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;06&lt;/td&gt;
&lt;td&gt;&lt;a href="section-06-adm.html"&gt;DBJ ADM&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The five-step wheel that authorizes delivery work but never performs delivery itself&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;07&lt;/td&gt;
&lt;td&gt;&lt;a href="section-07-taxonomy.html"&gt;DBJ Taxonomy&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The shared names and structure for the organisation&amp;rsquo;s information space, used without reinterpretation&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;—&lt;/td&gt;
&lt;td&gt;&lt;a href="vocabulary.html"&gt;Vocabulary&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Terms every role should be able to define on demand, without looking them up&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;!-- ![alt text](../kb/BPT_Operational_Model/engagement_architecture/simple_engagement_architecture.png) --&gt;
&lt;!-- **Continuous operational cycle** --&gt;
&lt;br/&gt;
&lt;p&gt;&lt;a href="../method/method_home.html"&gt;The Method Home&lt;/a&gt;&lt;/p&gt;</description></item><item><title>The BPT Cycles</title><link>https://method.dbj.org/entrance/section-04-bpt-deeper.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-04-bpt-deeper.html</guid><description>&lt;p&gt;&lt;a href="section-03-bpt.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-05-cmm-deeper.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;h1 id="the-b--p--t"&gt;The B ↔ P ↔ T&lt;/h1&gt;
&lt;blockquote&gt;
&lt;p&gt;&lt;strong&gt;DISAMBIGUATION&lt;/strong&gt; — &amp;ldquo;BPT Loop&amp;rdquo; and &amp;ldquo;Operating Model&amp;rdquo; are not synonyms; they are different altitudes of the same thing.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;BPT Loop&lt;/strong&gt; describes the mechanism — the endless Business · Product · Technology cycle.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;Operating Model&lt;/strong&gt; describes its role in the architecture — what BPT &lt;em&gt;is&lt;/em&gt; to the organization.&lt;/p&gt;
&lt;/blockquote&gt;
&lt;h2 id="one-flow-two-cycles"&gt;One Flow Two Cycles&lt;/h2&gt;
&lt;p&gt;&lt;strong&gt;DBJ Method Flow is made of Two Cycles chaining the B, P and T&lt;/strong&gt;&lt;/p&gt;</description></item><item><title>The DBJ Method</title><link>https://method.dbj.org/entrance/section-01-method.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-01-method.html</guid><description>&lt;p&gt;&lt;a href="index.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-02-cmm.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;!-- # The DBJ Method --&gt;
&lt;p&gt;A pragmatic, right-sized adaptation of TOGAF that makes Enterprise Architecture actionable for growing companies — without the overhead of a full TOGAF implementation.&lt;/p&gt;
&lt;h2 id="what-is-togaf"&gt;What is TOGAF?&lt;/h2&gt;
&lt;p&gt;TOGAF (&lt;a href="https://www.opengroup.org/togaf"&gt;The Open Group Architecture Framework&lt;/a&gt;) is the world&amp;rsquo;s leading EA framework. It also provides a structured method — the &lt;a href="https://en.wikipedia.org/wiki/TOGAF#Architecture_Development_Method"&gt;Architecture Development Method&lt;/a&gt; (ADM) — for designing, planning, implementing, and governing enterprise IT architecture.&lt;/p&gt;
&lt;p&gt;Think of TOGAF as a public library of Enterprise Architecture. TOGAF is complex and often overwhelming for organizations that have not yet established formal EA practices. The DBJ Method hides the TOGAF complexity.&lt;/p&gt;</description></item><item><title>The Three Method Domains</title><link>https://method.dbj.org/entrance/section-03-bpt.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/section-03-bpt.html</guid><description>&lt;p&gt;&lt;a href="section-02-cmm.html"&gt;← Back&lt;/a&gt; | &lt;a href="section-04-bpt-deeper.html"&gt;Next →&lt;/a&gt;&lt;/p&gt;
&lt;h1 id="the-core-of-the-operating-model"&gt;The core of the Operating model&lt;/h1&gt;
&lt;p&gt;The whole of the organization is divided into three &amp;ldquo;domains&amp;rdquo;. Domain name reflects its role.&lt;/p&gt;
&lt;ol&gt;
&lt;li&gt;Business&lt;/li&gt;
&lt;li&gt;Products&lt;/li&gt;
&lt;li&gt;Technology&lt;/li&gt;
&lt;/ol&gt;
&lt;p&gt;Decoupled but acting together, in what we call &amp;ldquo;BPT Loop&amp;rdquo; constellation.&lt;/p&gt;
&lt;!-- ![The BPT Loop](/assets/diagrams/bpt-loop.png) --&gt;
&lt;pre tabindex="0"&gt;&lt;code class="language-mermaid" data-lang="mermaid"&gt;flowchart
subgraph BPT[&amp;#34;Organization under B-P-T Operational Model&amp;lt;br/&amp;gt;&amp;lt;br/&amp;gt;&amp;#34;]
direction LR
subgraph B[&amp;#34;Business&amp;lt;br&amp;gt;Domain&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;#34;]
direction TB
end
subgraph P[&amp;#34;&amp;lt;br&amp;gt;Products&amp;lt;br&amp;gt;Domain&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;#34;]
direction TB
end
subgraph T[&amp;#34;Technology&amp;lt;br&amp;gt;Domain&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;lt;br&amp;gt;&amp;#34;]
direction TB
end
end
B &amp;lt;--&amp;gt;|Domain&amp;lt;br/&amp;gt;Iterations| P
P &amp;lt;--&amp;gt;|Domain&amp;lt;br/&amp;gt;Iterations| T
&lt;/code&gt;&lt;/pre&gt;&lt;p&gt;It is as simple as that. The &amp;ldquo;core of the trick&amp;rdquo; is to follow this simple concept when adding details to it.&lt;/p&gt;</description></item><item><title>Vocabulary</title><link>https://method.dbj.org/entrance/vocabulary.html</link><pubDate>Mon, 01 Jan 0001 00:00:00 +0000</pubDate><guid>https://method.dbj.org/entrance/vocabulary.html</guid><description>&lt;p&gt;&lt;a href="section-07-taxonomy.html"&gt;← Back&lt;/a&gt; | &lt;a href="entrance_home.html"&gt;Top&lt;/a&gt;&lt;/p&gt;
&lt;h1 id="organization-vocabulary"&gt;Organization Vocabulary&lt;/h1&gt;
&lt;p&gt;A shared vocabulary is a prerequisite for CMM Level 3. All staff should be able to understand and apply these terms.&lt;/p&gt;
&lt;table&gt;
&lt;thead&gt;
&lt;tr&gt;
&lt;th&gt;Term&lt;/th&gt;
&lt;th&gt;Definition&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://www.opengroup.org/togaf"&gt;&lt;strong&gt;TOGAF&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The Open Group Architecture Framework. The world&amp;rsquo;s most widely adopted Enterprise Architecture framework, providing the ADM guidance, reference models, and governance structures.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/method_home.html"&gt;&lt;strong&gt;DBJ Method&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;A right-sized adaptation of TOGAF designed for smaller, fast-moving organisations. Preserves TOGAF&amp;rsquo;s maturity model and domain structure while reducing ceremonial overhead.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://en.wikipedia.org/wiki/Enterprise_architecture"&gt;&lt;strong&gt;Enterprise Architecture (EA)&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The practice of aligning an organisation&amp;rsquo;s strategy, processes, information, and technology into a coherent, governed whole. EA makes complex decisions tractable and auditable.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/cmm/"&gt;&lt;strong&gt;CMM&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Capability Maturity Model. A five-level framework (Initial → Repeatable → Defined → Managed → Optimising) that measures the maturity of an organisation&amp;rsquo;s processes and practices.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/cmm/#levels"&gt;&lt;strong&gt;CMM Level 3 (Defined)&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The state where processes are fully documented, standardised, and integrated across the organisation. All domains operate from a shared playbook. Boot Camp target.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/bpt/"&gt;&lt;strong&gt;Domain&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;One of three organisational operating areas in the DBJ Method: Business, Products, or Technology. Each domain has a distinct mandate, accountabilities, and artefact responsibilities.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/bpt/"&gt;&lt;strong&gt;Business Domain&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Sets strategic intent, commissions initiatives, defines outcome criteria, and conducts User Acceptance Testing (UAT). Owns the decisions on &lt;em&gt;why&lt;/em&gt; and the &lt;em&gt;what&lt;/em&gt;.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/bpt/"&gt;&lt;strong&gt;Products Domain&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Translates Business strategy into Technology-ready requirements. Manages the backlog, owns the solutions, and coordinates UAT. The bridge domain in the (BPT) B ↔ P ↔ T cycle.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/bpt/"&gt;&lt;strong&gt;Technology Domain&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Builds, integrates, and operates systems per the product specifications. Applies technical governance and architecture standards. Owns the &lt;em&gt;how it&amp;rsquo;s built&lt;/em&gt; decisions.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/bpt/"&gt;&lt;strong&gt;(BPT) B ↔ P ↔ T Cycle&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The DBJ Method&amp;rsquo;s core operating rhythm. Business commissions → Products translates → Technology builds → Products stages for UAT → Business accepts. Iterative and domain-explicit.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://en.wikipedia.org/wiki/Acceptance_testing"&gt;&lt;strong&gt;UAT&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;User Acceptance Testing. The formal process by which the Business domain validates that a delivered increment meets the outcome criteria set at commission. Outcome is passed onto &amp;ldquo;final&amp;rdquo; P &amp;ndash;&amp;gt; T for deployment and the cycle closure.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="section-05.html"&gt;&lt;strong&gt;Bridge to AI&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;The DBJ thesis that CMM maturity is the prerequisite for responsible AI adoption. AI is layered into processes progressively at L3 (documentation), L4 (decision support), and L5 (optimisation).&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;a href="https://method.dbj.org/method/adm/"&gt;&lt;strong&gt;DBJ ADM&lt;/strong&gt;&lt;/a&gt;&lt;/td&gt;
&lt;td&gt;Architecture Development Method. Simplified TOGAF phase model (Preliminary → A through H → Requirements Management) for developing and evolving enterprise architecture.&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;
&lt;td&gt;&lt;strong&gt;Domain Lead&lt;/strong&gt;&lt;/td&gt;
&lt;td&gt;The designated person accountable for decisions within a domain. Co-owns cycle governance alongside other two domain Leads. Escalates cross-domain conflicts to shared resolution.&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;</description></item></channel></rss>